The test
Scenario file : setup, then each stage's action and what the controller must do, within a time limit.
What you're looking at: a recording of one automated commissioning test. On the leftIn the picture, a simulated bulk-material line (three bins → gates → feeder → conveyor → hopper) run by its control program, which sees only I/O, exactly as a PLC would. On the rightBelow it, the test: it operates the line, injects any fault, and checks the controller's response stage by stage, each against a time limit. The playback is the run's own recorded telemetry, not an animation.
Swipe the picture sideways to see the whole line.
Scenario file : setup, then each stage's action and what the controller must do, within a time limit.
DI/AI are inputs from sensors, DO/AO are outputs to motors and valves. Hover a row for its description; a highlighted row changed this tick.